The total demand load for the Institute is 420 KVA.To meet the power requirement, three numbers of Sub-station such as 500KVA (for Acdemic purpose),150 (for Workshop purpose)and 250KVA (for the Hostels and staff quarters ) have been installed.To ensure uninterrupted power supply the Institute provides two numbers of DG sets with 100KVA and 250KVA capacities.